When the frame is the only part you need
Framing is its own service at NXT Build, separate from building the whole house. In Asbury it comes up when someone building on a new lot already has a plan, a foundation crew or a general builder lined up, and needs a framing crew that will stand the walls and roof up correctly and on the dates promised. It also comes up on remodels, where a wall is moving, a room is opening up, or new framing has to meet an older house that has settled over the years.
We work from your drawings. If you are a builder, we fit into your schedule and leave the shell ready for your trades. If you are a homeowner running your own build, Collin walks you through what has to be done before we arrive and what comes after we leave, so nothing sits waiting. Our full list of work is on the services page, and when a project needs more than a frame, the same crew does custom home building and home additions around town too.
Remodel framing starts by reading the house. Before a wall comes out, we find out what it is carrying, and if it holds up a floor or the roof, that load gets a new path through a header or beam before the old studs go. New walls tied into an older house rarely meet a square corner, so we shim and scribe to what is really there and keep the new work true. That is what lets the drywall and trim crews finish clean at the line where old meets new.
Stick framing over a basement, or a post-frame shell
Plenty of houses in Asbury sit over a basement, and those are stick-framed: a floor system on the foundation, studded walls standing on the floor, then trusses or rafters on top. A post-frame building goes together differently. Posts set the structure and carry the roof, and the walls fill in between them, which is why it suits shops, storage buildings, light commercial buildings and barndominium shells where an open floor matters.
We frame both. Collin led post-frame builds for eleven years with an eastern Iowa contractor before he started NXT Build in 2024, so a post-frame shell is home turf. Stick framing on houses is the other half of what the company builds. Most of the time your drawings and how you plan to use the building settle the choice, and if they leave it open, we can work it out standing on the lot.
Walkout foundations and the first wall
West of Dubuque the land rolls, and a good share of Asbury basements are walkouts, buried on the street side and open at the back. That gives you a foundation wall that is tall at one end and short at the other, and a framer who has to start from the top of it. Before any wall gets stood up, we check that foundation for square and level, corner to corner and along every run.
A wall can only be as straight as the plate under it.
Concrete is rarely perfect. Where the top of the wall is off, the sill plate gets shimmed or adjusted so the floor system lands flat, and where corners are out of square, a tape pulled across the diagonals tells us before a single nail goes in. Finding it here is quick. Finding it at drywall means doors that drift open and cabinets that rock. On a walkout, the tall back wall is also where the big windows tend to go, so those openings get laid out against the plan before the wall is lifted.
Sheathing, wrap and decking to close it in
The frame is not finished when the last wall stands. Walls get sheathed, the roof gets decked, and the shell gets wrapped so weather stays outside while plumbers, electricians and the window crew do their part.
Sheathing is also where a frame gets much of its stiffness, so nail spacing at the edges and in the field matters even though nobody sees it once siding goes on. Wrap goes on lapped so water sheds out and down, with openings cut and folded so the windows can be flashed properly. When the decking is down, the roof is ready for shingles or steel, and if you want us on that too, look at our roofing work in Asbury.
Weather mid-frame, then the inspection
Eastern Iowa summer storms can build in an afternoon, and a house with open walls and bare trusses is exposed when they do. Asbury is an easy drive up from Zwingle, so the crew can be back on the lot quickly to tarp open walls, cover stacked lumber and tighten bracing before the weather arrives, then walk the site once it clears.
When the frame is done and the shell is closed in, Collin books the framing inspection. A parcel inside Asbury goes through the city, and ground outside town goes to Dubuque County. Anything the inspector flags gets fixed before the next trade starts, so the job keeps moving. See our work in the project gallery, or send us your plans and we will look them over.
Asbury, IA
Rolling ground west of Dubuque, an easy drive up from home base in Zwingle.